Envirostud Installation Guide

Envirostud Installation

Fix enviro-stud®-Stud horizontally at 600mm vertical centres onto walls using plugs and screws. Starting at the bottom of the wall.464

Add insulation of choice between Insulated studs

454Tape all joints between studs and insulation with foil tape to create air & vapour tight seal.

4554nt654554Add VCL or Intelligent membrane to aerogel & wood fibre.

1817

Fix vertical batten at 600mm centres. By creating a service void in front of the Vapour control Layer & insulation allows all services to be installed without the risk of vapour & heat loss

12Add finish board